How to Check PAS 24 Evidence on a Patio Door Quote

hf 20261026 135033 4c08c942 6df3 48c1 bd53 e0cea50e93e1

You’ve asked two companies to quote for the same opening. Both have included sliding doors. Both quotes say PAS 24. One shows a drawing with three panels, the opening direction and the threshold. The other gives a product name and a short security description. The useful question is whether the evidence each company can supply covers the doorset you would actually order.

For many homeowners, this comes up during a rear extension. Part Q is concerned with new dwellings in England, so an ordinary extension to an existing home generally sits outside its scope. You can still ask for a security specification and evidence to support it. This guide takes you from the first quote to the final approval drawing, including what to do when the design changes. Approved Document Q · CBP’s guide to Part Q and extensions

Does Part Q Apply to the Doors in Your Extension?

First, establish what the project creates. Adding a kitchen-diner and patio doors to an existing house generally falls outside Part Q’s new-dwelling scope. The same rear doors in a house being built from scratch form part of a new dwelling. An annexe or conversion that creates a new dwelling calls for a separate assessment, including whether the Building Regulations provisions for material change of use apply. Approved Document Q · Building Regulations 2010, regulations 5 and 6

In practice, the design brief may already call for enhanced security irrespective of that scope. Your architect may have written a performance requirement into the schedule. You may want to compare two doors on the same basis before deciding which to buy. If a quote mentions Part Q or PAS 24, ask whether the supplier is responding to a regulatory requirement identified for the project, a requirement in the schedule or a specification they have chosen to offer.

Keep that answer with the quote. For an extension intended to provide independent accommodation, settle the project’s status before finalising the door schedule. For a straightforward kitchen extension, agree the level of security evidence you want at the same time as you agree the panel arrangement and threshold. The conversation is easier while the supplier can still propose options. CBP’s guide to Part Q and extensions

Why an Accessible Opening Belongs on the Security Schedule

A patio door that opens onto a terrace is an obvious place to discuss security. On a sloping site, the house can be less straightforward. A door to a lower-ground-floor garden may be readily reached from the rear even though the same storey sits below the pavement at the front. A raised deck or altered external level can change the relationship between the house and a nearby opening.

For projects within its scope, Approved Document Q addresses accessible doors and windows, including some openings whose accessibility depends on surrounding levels. Use the site plan and sections to flag which openings the team should review. For an ordinary extension, the same exercise gives the homeowner and designer a sensible basis for deciding where a security specification matters in everyday use. Approved Document Q, Sections 1 and 2

Look at the patio door alongside the rest of the elevation. There may be a side entrance serving a utility room or another door that the occupants use most of the time. Give each a reference on the schedule and record the security brief against the relevant opening. That lets the builder, designer and glazing company discuss the same doors, even if external works or the way into the garden change during design.

 

hf 20261026 135102 b2a147f7 5f61 4aa1 9a1a c46e2cf82ec2

 

 

What a PAS 24 Claim on a Quote Actually Covers

PAS 24 is a security performance specification for doorsets and windows. When a supplier cites it, ask what information supports the claim for the assembly on the quote. A doorset includes the frame, leaves or moving panels, glazing and hardware that work together. The evidence may cover a family of configurations, so the practical question is whether the proposed configuration falls within that scope. BSI’s overview of PAS 24

Ask what evidence the supplier can provide and which edition of PAS 24 it refers to. The published Approved Document Q cites PAS 24:2012 in its test guidance. BSI has since published editions including PAS 24:2022+A1:2024. Where the job needs a particular compliance route or specification, give the evidence to the person responsible for confirming what the project will accept. Approved Document Q, Sections 1 and 2 · BSI’s PAS 24 certification updates

A brochure can help identify the system and its options. For purchasing, ask for a document or written technical confirmation you can match to the order. Save it with the drawing revision, so the team can see which version of the doorset the evidence relates to.

Which Details to Match Against the Door Drawing

Take an illustrative three-panel sliding door with one moving panel and two fixed panels. The quote may list a general product range. The approval drawing should show which panels move, the opening direction, the size and the threshold being priced. Use that drawing as the reference when asking whether the proposed doorset is covered.

What is shown on the quote or drawing What to ask the supplier to confirm
Product and system reference The evidence refers to the specified system or applicable product family.
Width and height The quoted dimensions are within the scope of the evidence relied on.
Panel layout and opening configuration The intended arrangement of fixed and moving panels is covered.
Threshold, glazing and hardware The specified options are included or accepted within the scope relied on.
Drawing number and revision The confirmation relates to the current configuration.

The check is especially useful when two door layouts can achieve the same outside proportions. A homeowner may accept a revised panel arrangement to get a wider opening on one side. The elevations might look similar while the moving elements and hardware differ.

You should be able to put the quote, drawing and confirmation next to one another and see what is being supplied. If the link between them is unclear, ask the supplier’s technical team to identify the exact configuration their evidence covers.

 

 

hf 20261026 134400 b1aa3e79 8f5a 49de a1fe 374aa45362ac

 

What to Check When the Specification Changes

A new drawing may arrive after the builder checks the opening or after someone reviews the access requirements. Perhaps the door becomes wider. Perhaps the threshold changes to suit the patio levels. A different glass build-up or handle may be offered during procurement. Each change is a good reason to check whether the original confirmation still applies.

Record the change in plain terms and give the supplier the revised drawing. Ask them to confirm whether the evidence still covers that configuration or whether different evidence or a different option is needed. A quick verbal assurance can be useful in discussion. A written response against a drawing revision is easier for the architect, builder and homeowner to trace later.

Consider a slider originally drawn with a fixed central pane and a moving panel at one end. The homeowner decides midway through design that a different panel should open to improve access from the kitchen. Update the panel arrangement on the order and ask for the security confirmation to refer to that revised arrangement. The point is to carry the technical decision forward with the drawings.

Apply the same approach when a supplier suggests a substitution to meet a deadline. Establish which required characteristics the proposed replacement provides before you agree to it. That will also help the team decide whether the change affects any other part of the specification.

How Security Fits Alongside Safety Glass and Access

Patio doors often sit where people pass between a kitchen, dining area and terrace. The glass may be in a critical impact location under Part K. The threshold needs to work with the inside and outside levels and with the way occupants use the opening. Where a designer has assigned an escape function to an external door, that function needs to be checked as part of the project too. Approved Document K, Section 5 · Approved Document B, Volume 1

Include separate entries on the schedule for security, impact safety, access and any escape role. Take a family choosing a threshold for a garden that is used daily. The builder needs the section through the proposed threshold. The glazing team needs the agreed door option and the adjoining finishes. If the threshold option changes, the supplier can confirm which parts of the performance specification still apply to the revised doorset.

The glazing around the door deserves the same coordination. A fixed glazed panel beside the slider could bring its own impact-safety checks, depending on its position. Ask the team to review the full elevation, including any separately framed sidelight or window. CBP’s guide to critical safety glazing locations

 

hf 20261026 135041 260f5de5 d3c2 4e23 999d b6117bf9a0ba

 

How to Compare Two Patio Door Quotes Fairly

Start by giving both suppliers the same drawing and brief. Ask them to identify the system they propose, the approximate opening dimensions they are pricing and any assumptions that remain subject to survey. Check whether both quotes include the same opening layout and threshold. That establishes whether you are comparing two offers for the same design.

Then ask for the security evidence in the same terms. If one company has provided written confirmation covering the proposed assembly and another has supplied a range brochure, follow up with the second company while both offers are still under consideration. Ask who will confirm the scope after survey, when dimensions and the final options are available.

Where a quote excludes some work, clarify how that affects the installation. For example, the builder may be responsible for preparing the opening and setting the levels. The schedule should make that handoff clear. Confirm who will approve the drawings and who the installation team contacts if the prepared opening differs from the survey.

Once the scope, assumptions and evidence are clear, the price comparison becomes more meaningful. Keep a dated copy of the offer you accept and any written confirmation that follows. Those records are useful if a different product or configuration is proposed before manufacture.

What to Record Before Order and Keep at Handover

Ask for a short set of documents that describes the finished work. It can be as simple as an approved drawing, a specification or order confirmation and the evidence the project team agreed was appropriate. Check that the panel arrangement, thresholds and hardware in the order follow the drawing you approved. Ask who will check any subsequent change.

At handover, keep the final doorset information, the applicable security evidence, the installer’s records and the operating and maintenance information. Ask to be shown how the door is operated and locked. If you have more than one set of doors, identify which documents relate to which opening. A clear record will help if you ever need a spare part or need to explain the installation to another contractor.

For an extension being managed as a wider project, give the relevant information to the architect or main contractor so it can sit alongside the rest of the building records. If the job falls within Part Q’s scope, make sure the person responsible for compliance has the evidence they need. Approved Document Q

For projects across Bath, Wiltshire, Somerset, Bristol and the Cotswolds, share your planned opening, elevations and any performance brief with CBP. We can discuss the proposed doorset and the information the design team will need before the specification is fixed. Discuss your patio door specification with CBP